City Engineering / Bill Millis, P.E.
SUA Project No. 22WL01
Visit the GIS Infrastructure Map to see where city infrastructure projects are happening.
The City of Stillwater and the Stillwater Utilities Authority are working on a project to improve water quality throughout the distribution system. Water Utilities staff currently flush water through hydrants in order to move disinfectant residual through the system. A project is necessary to maximize the disinfectant residual quality and stability in the distribution system.
The project aims to maximize the disinfectant residual quality and stability in the water distribution system to ensure that ODEQ regulations can be met efficiently and cost effectively.
Oct. 18, 2021: Project approved by the SUA Trustees.
10.18.21 | SUA-21-46 | Professional Services Agreement
![]() |